Back to documentation
Working With Projects

Rolling Back Changes

Return your product to an earlier version safely — with code and data considered separately.

Sometimes a change looks right in description and wrong in reality. Rollbacks let you return your product to an earlier version. Every build and change is saved as a version, so there is always a well-defined earlier state to return to.

How to roll back

Open your project's Versions page, pick the version you want, and roll back.

  • Websites: the earlier version is republished to the same address almost instantly.
  • Apps: 9orb redeploys the earlier version's code to your app.

Rolling back does not erase history — the version you rolled back from stays in the list and can be restored later.

The honest caveat: data does not roll back with code

Rolling back an app changes its code, not its data:

  • If the change you are undoing added something to the database (a new table or field), that addition usually stays in place harmlessly. When versions in between involve database changes, 9orb asks you to confirm before rolling back.
  • Data created while the newer version was live (bookings made, users registered) is kept. Rollbacks change your product's behavior, not its memory.

Partial undo

You rarely need a full rollback. If yesterday's change had three parts and one is wrong, a change request — "undo the pricing table change from yesterday, keep everything else" — reverts just that, as a normal change with its cost shown first.

Costs

Rolling back to an earlier version does not use credits. A partial undo through a change request costs the same as any other change.

Habit worth forming: after approving any significant change, look at the live product promptly. The sooner a problem is noticed, the simpler it is to undo.